Tests
Which tests
Run every step on the live sites: the customer portal and this staff portal. Blocking tickets as of 2026-10-08 (docs/qat/blocker_status.csv).
| Phase | # | Test name | Role | Status |
|---|---|---|---|---|
| 1 | 1 | Pre-qualification | Customer | Bug or failed
|
| 1 | 2 | Approve | Customer, Staff | Not run
|
| 1 | 3 | Deny | Customer, Staff | Not run
|
| 1 | 4 | Correct | Customer, Staff | Not run
|
| 1.5 | 1 | Before you start | Staff, Customer | Blocked — 2 of 4 steps ready
|
| 1.5 | 2 | First sign-in | Customer, Staff | Blocked
|
| 1.5 | 3 | Clean up | Staff | Blocked
|
| 2 | 1 | Before you start | Staff, Customer | Blocked — 3 of 4 steps ready
|
| 2 | 2 | Register and approve | Contractor, Staff | Blocked — 2 of 8 steps ready
|
| 2 | 3 | Refuse | Contractor, Staff | Blocked — 1 of 3 steps ready
|
| 2 | 4 | Pre-loaded contractor | Contractor | Blocked
|
| 2 | 5 | Clean up | Staff | Blocked
|
| 3 | 1 | Before you start | Staff, Customer, Contractor | Blocked — 2 of 5 steps ready
|
| 3 | 2 | Customer's code | Customer, Contractor | Blocked — 1 of 7 steps ready
|
| 3 | 3 | Contractor's invite link | Contractor, Customer | Blocked
|
| 3 | 4 | Clean up | Staff | Blocked
|
| 4 | 1 | Before you start | Staff, Customer, Contractor | Blocked — 2 of 5 steps ready
|
| 4 | 2 | Approve | Contractor, Staff, Customer | Blocked — 1 of 7 steps ready
|
| 4 | 3 | Deny | Contractor, Staff, Customer | Blocked — 1 of 6 steps ready
|
| 4 | 4 | Send back | Contractor, Staff | Blocked
|
| 4 | 5 | Clean up | Staff | Blocked
|
| 5 | 1 | Before you start | Staff, Customer, Contractor | Blocked — 3 of 5 steps ready
|
| 5 | 2 | Submit for payment | Contractor, Customer, Staff | Blocked — 1 of 5 steps ready
|
| 5 | 3 | Clean up | Staff | Blocked
|
| 5.5 | 1 | Before you start | Staff, Customer | Blocked — 2 of 4 steps ready
|
| 5.5 | 2 | Quality visit | Staff, Customer | Not run
|
| 5.5 | 3 | Automatic picking | Staff | Blocked
|
| 5.5 | 4 | Clean up | Staff | Blocked
|
| 6 | 1 | Before you start | Staff, Customer, Contractor | Blocked — 2 of 5 steps ready
|
| 6 | 2 | Approve and pay | Staff, Customer, Contractor | Blocked — 3 of 6 steps ready
|
| 6 | 3 | Send back | Staff, Contractor | Blocked
|
| 6 | 4 | Refuse | Staff, Customer, Contractor | Blocked — 1 of 3 steps ready
|
| 6 | 5 | Clean up | Staff | Blocked
|
| 7 | 1 | Before you start | Staff, Customer | Blocked — 3 of 4 steps ready
|
| 7 | 2 | DOE bulk report | Staff | Blocked
|
| 7 | 3 | Clean up | Staff | Blocked
|
Pre-qualification
0 of 8 completed, 1 bug or failed.
-
PRE-01: Bug or failed
PRE-01 · Bug or failed
191 check, second look
Test user · 10/05/2026 12:41 PM CST - PRE-02: Not run PRE-02 · Not run · ready
- PRE-03: Not run PRE-03 · Not run · ready
- PRE-04: Not run PRE-04 · Not run · ready
- PRE-05: Not run PRE-05 · Not run · unblocked by customer #108, please retest
- PRE-06: Not run PRE-06 · Not run · ready
- PRE-07: Not run PRE-07 · Not run · ready
- PRE-08: Not run PRE-08 · Not run · ready
PRE-01
Customer Bug or failed- Do this
- Choose an IRA staff tester account with access to both live portals.
- Expected
- Both portals admit the tester; an ordinary customer cannot open staff review screens.
- Bug or failed
10/05/2026 12:41 PM CST · Test user test.user@example.com
191 check, second look
- Completed
10/05/2026 12:41 PM CST · Test user test.user@example.com
191 check
No result has been recorded for PRE-01 yet.
PRE-02
Customer Not run- Do this
- Prepare three separate made-up multifamily building identities labeled APPROVE, DENY and CORRECT.
- Expected
- Each case has a different building and a unique name or address that can be matched in both portals.
No result has been recorded for PRE-02 yet.
PRE-03
Customer Not run- Do this
- Prepare harmless sample documents without real names, income or account numbers.
- Expected
- The files can be uploaded for testing without exposing a real person’s information.
No result has been recorded for PRE-03 yet.
PRE-04
Customer Not run- Do this
- Check that the live new-customer entry and confirmation email work.
- Expected
- A new test customer can create an account, confirm its email and sign in; otherwise mark later sign-up steps Blocked.
No result has been recorded for PRE-04 yet.
PRE-05
Customer Not run- Do this
- Check that staff can save a live building decision and issue a building code.
- Expected
- A maintainer has cleared staff portal #186 with a successful live check; otherwise mark decision steps Blocked.
Unblocked by customer #108 — please retest.
No result has been recorded for PRE-05 yet.
PRE-06
Customer Not run- Do this
- Record the tester name and a case ID for each building.
- Expected
- Every completed row can be traced to one tester and one building without using real personal details.
No result has been recorded for PRE-06 yet.
PRE-07
Customer Not run- Do this
- Use Yes for a step that worked, No for a tried step that failed, and Blocked for a step you could not try.
- Expected
- Failed and unavailable steps are not reported as passes.
No result has been recorded for PRE-07 yet.
PRE-08
Customer Not run- Do this
- Arrange removal of the three made-up accounts, buildings and uploaded samples after the testing round.
- Expected
- The responsible person and cleanup plan are recorded before testing begins.
No result has been recorded for PRE-08 yet.
Approve
0 of 13 completed.
- APPROVE-01: Not run APPROVE-01 · Not run · ready
- APPROVE-02: Not run APPROVE-02 · Not run · ready
- APPROVE-03: Not run APPROVE-03 · Not run · ready
- APPROVE-04: Not run APPROVE-04 · Not run · ready
- APPROVE-05: Not run APPROVE-05 · Not run · ready
- APPROVE-06: Not run APPROVE-06 · Not run · ready
- APPROVE-07: Not run APPROVE-07 · Not run · ready
- APPROVE-08: Not run APPROVE-08 · Not run · ready
- APPROVE-09: Not run APPROVE-09 · Not run · ready
- APPROVE-10: Not run APPROVE-10 · Not run · ready
- APPROVE-11: Not run APPROVE-11 · Not run · unblocked by customer #108, please retest
- APPROVE-12: Not run APPROVE-12 · Not run · unblocked by customer #108, please retest
- APPROVE-13: Not run APPROVE-13 · Not run · unblocked by customer #108, please retest
APPROVE-01
Customer Not run- Do this
- Open the live portal’s new multifamily customer path in a fresh browser session.
- Expected
- The page identifies the multifamily owner path and offers account creation.
No result has been recorded for APPROVE-01 yet.
APPROVE-02
Customer Not run- Do this
- Create a new account with an invented name and a unique test email for this case.
- Expected
- The portal accepts the account request and tells the customer how to confirm the email.
No result has been recorded for APPROVE-02 yet.
APPROVE-03
Customer Not run- Do this
- Open the confirmation email and complete its link.
- Expected
- The account becomes active and the customer reaches the portal signed in.
No result has been recorded for APPROVE-03 yet.
APPROVE-04
Customer Not run- Do this
- Sign out, then sign in again with the same test account.
- Expected
- The same account opens and any saved property remains available.
No result has been recorded for APPROVE-04 yet.
APPROVE-05
Customer Not run- Do this
- Add a named multifamily property and one building with at least four occupied units.
- Expected
- The property, building and occupied-unit count appear under the test account.
No result has been recorded for APPROVE-05 yet.
APPROVE-06
Customer Not run- Do this
- Use one permitted income-proof route and upload the harmless sample document for enough units.
- Expected
- The building shows the documents and the number of occupied units still needed for review.
No result has been recorded for APPROVE-06 yet.
APPROVE-07
Customer Not run- Do this
- Review the building’s progress and open its Sign and send step.
- Expected
- The page states what is ready, names any missing proof and asks who is signing.
No result has been recorded for APPROVE-07 yet.
APPROVE-08
Customer Not run- Do this
- Sign and send this building for income review.
- Expected
- The building says it was sent to program staff and normal edits are locked during review.
No result has been recorded for APPROVE-08 yet.
APPROVE-09
Staff Not run- Do this
- Sign in to the live staff portal and find this building’s Multifamily Income Qualification.
- Expected
- The record matches the test account, building and submitted status; it is not another case.
No result has been recorded for APPROVE-09 yet.
APPROVE-10
Staff Not run- Do this
- Open each sample attachment from the building’s review page.
- Expected
- The actual file opens for staff; seeing only its filename does not count as Yes.
No result has been recorded for APPROVE-10 yet.
APPROVE-11
Staff Not run- Do this
- Confirm the required unit or housing-program proof and approve this building.
- Expected
- The decision saves as Approved and issues an LEA or MEA building code with an expiry date.
Unblocked by customer #108 — please retest.
No result has been recorded for APPROVE-11 yet.
APPROVE-12
Customer Not run- Do this
- Return to the same building in the customer portal and refresh it.
- Expected
- The building says Approved and shows its code and valid-until date.
Unblocked by customer #108 — please retest.
No result has been recorded for APPROVE-12 yet.
APPROVE-13
Customer Not run- Do this
- Compare the code prefix with the approved income tier.
- Expected
- A low-income result has LEA; a moderate-income result has MEA. A wrong prefix is No, even if a code exists.
Unblocked by customer #108 — please retest.
No result has been recorded for APPROVE-13 yet.
Deny
0 of 13 completed.
- DENY-01: Not run DENY-01 · Not run · ready
- DENY-02: Not run DENY-02 · Not run · ready
- DENY-03: Not run DENY-03 · Not run · ready
- DENY-04: Not run DENY-04 · Not run · ready
- DENY-05: Not run DENY-05 · Not run · ready
- DENY-06: Not run DENY-06 · Not run · ready
- DENY-07: Not run DENY-07 · Not run · ready
- DENY-08: Not run DENY-08 · Not run · ready
- DENY-09: Not run DENY-09 · Not run · ready
- DENY-10: Not run DENY-10 · Not run · ready
- DENY-11: Not run DENY-11 · Not run · unblocked by customer #108, please retest
- DENY-12: Not run DENY-12 · Not run · unblocked by customer #108, please retest
- DENY-13: Not run DENY-13 · Not run · unblocked by customer #108, please retest
DENY-01
Customer Not run- Do this
- Open the live portal’s new multifamily customer path in a fresh browser session.
- Expected
- The page identifies the multifamily owner path and offers account creation.
No result has been recorded for DENY-01 yet.
DENY-02
Customer Not run- Do this
- Create a new account with an invented name and a unique test email for this case.
- Expected
- The portal accepts the account request and tells the customer how to confirm the email.
No result has been recorded for DENY-02 yet.
DENY-03
Customer Not run- Do this
- Open the confirmation email and complete its link.
- Expected
- The account becomes active and the customer reaches the portal signed in.
No result has been recorded for DENY-03 yet.
DENY-04
Customer Not run- Do this
- Sign out, then sign in again with the same test account.
- Expected
- The same account opens and any saved property remains available.
No result has been recorded for DENY-04 yet.
DENY-05
Customer Not run- Do this
- Add a named multifamily property and one building with at least four occupied units.
- Expected
- The property, building and occupied-unit count appear under the test account.
No result has been recorded for DENY-05 yet.
DENY-06
Customer Not run- Do this
- Use one permitted income-proof route and upload the harmless sample document for enough units.
- Expected
- The building shows the documents and the number of occupied units still needed for review.
No result has been recorded for DENY-06 yet.
DENY-07
Customer Not run- Do this
- Review the building’s progress and open its Sign and send step.
- Expected
- The page states what is ready, names any missing proof and asks who is signing.
No result has been recorded for DENY-07 yet.
DENY-08
Customer Not run- Do this
- Sign and send this building for income review.
- Expected
- The building says it was sent to program staff and normal edits are locked during review.
No result has been recorded for DENY-08 yet.
DENY-09
Staff Not run- Do this
- Sign in to the live staff portal and find this building’s Multifamily Income Qualification.
- Expected
- The record matches the test account, building and submitted status; it is not another case.
No result has been recorded for DENY-09 yet.
DENY-10
Staff Not run- Do this
- Open each sample attachment from the building’s review page.
- Expected
- The actual file opens for staff; seeing only its filename does not count as Yes.
No result has been recorded for DENY-10 yet.
DENY-11
Staff Not run- Do this
- Deny this building and enter a plain-language reason that the customer can act on.
- Expected
- The denial saves on this building and the staff record keeps the reason.
Unblocked by customer #108 — please retest.
No result has been recorded for DENY-11 yet.
DENY-12
Customer Not run- Do this
- Return to the same building in the customer portal and refresh it.
- Expected
- The building says Not approved and clearly shows the reason for denial; no approval code appears.
Unblocked by customer #108 — please retest.
No result has been recorded for DENY-12 yet.
DENY-13
Customer Not run- Do this
- Reopen the APPROVE building and compare its result.
- Expected
- The DENY decision did not change the separate APPROVE case.
Unblocked by customer #108 — please retest.
No result has been recorded for DENY-13 yet.
Correct
0 of 15 completed.
- CORRECT-01: Not run CORRECT-01 · Not run · ready
- CORRECT-02: Not run CORRECT-02 · Not run · ready
- CORRECT-03: Not run CORRECT-03 · Not run · ready
- CORRECT-04: Not run CORRECT-04 · Not run · ready
- CORRECT-05: Not run CORRECT-05 · Not run · ready
- CORRECT-06: Not run CORRECT-06 · Not run · ready
- CORRECT-07: Not run CORRECT-07 · Not run · ready
- CORRECT-08: Not run CORRECT-08 · Not run · ready
- CORRECT-09: Not run CORRECT-09 · Not run · ready
- CORRECT-10: Not run CORRECT-10 · Not run · ready
- CORRECT-11: Not run CORRECT-11 · Not run · unblocked by customer #108, please retest
- CORRECT-12: Not run CORRECT-12 · Not run · unblocked by customer #108, please retest
- CORRECT-13: Not run CORRECT-13 · Not run · unblocked by customer #108, please retest
- CORRECT-14: Not run CORRECT-14 · Not run · unblocked by customer #108, please retest
- CORRECT-15: Not run CORRECT-15 · Not run · unblocked by customer #108, please retest
CORRECT-01
Customer Not run- Do this
- Open the live portal’s new multifamily customer path in a fresh browser session.
- Expected
- The page identifies the multifamily owner path and offers account creation.
No result has been recorded for CORRECT-01 yet.
CORRECT-02
Customer Not run- Do this
- Create a new account with an invented name and a unique test email for this case.
- Expected
- The portal accepts the account request and tells the customer how to confirm the email.
No result has been recorded for CORRECT-02 yet.
CORRECT-03
Customer Not run- Do this
- Open the confirmation email and complete its link.
- Expected
- The account becomes active and the customer reaches the portal signed in.
No result has been recorded for CORRECT-03 yet.
CORRECT-04
Customer Not run- Do this
- Sign out, then sign in again with the same test account.
- Expected
- The same account opens and any saved property remains available.
No result has been recorded for CORRECT-04 yet.
CORRECT-05
Customer Not run- Do this
- Add a named multifamily property and one building with at least four occupied units.
- Expected
- The property, building and occupied-unit count appear under the test account.
No result has been recorded for CORRECT-05 yet.
CORRECT-06
Customer Not run- Do this
- Use one permitted income-proof route and upload the harmless sample document for enough units.
- Expected
- The building shows the documents and the number of occupied units still needed for review.
No result has been recorded for CORRECT-06 yet.
CORRECT-07
Customer Not run- Do this
- Review the building’s progress and open its Sign and send step.
- Expected
- The page states what is ready, names any missing proof and asks who is signing.
No result has been recorded for CORRECT-07 yet.
CORRECT-08
Customer Not run- Do this
- Sign and send this building for income review.
- Expected
- The building says it was sent to program staff and normal edits are locked during review.
No result has been recorded for CORRECT-08 yet.
CORRECT-09
Staff Not run- Do this
- Sign in to the live staff portal and find this building’s Multifamily Income Qualification.
- Expected
- The record matches the test account, building and submitted status; it is not another case.
No result has been recorded for CORRECT-09 yet.
CORRECT-10
Staff Not run- Do this
- Open each sample attachment from the building’s review page.
- Expected
- The actual file opens for staff; seeing only its filename does not count as Yes.
No result has been recorded for CORRECT-10 yet.
CORRECT-11
Staff Not run- Do this
- Send this building back with one specific request for a correction.
- Expected
- The staff record shows Sent back and keeps the request tied to this building.
Unblocked by customer #108 — please retest.
No result has been recorded for CORRECT-11 yet.
CORRECT-12
Customer Not run- Do this
- Return to the same building in the customer portal and refresh it.
- Expected
- The building says Sent back to you and shows what needs correction.
Unblocked by customer #108 — please retest.
No result has been recorded for CORRECT-12 yet.
CORRECT-13
Customer Not run- Do this
- Make the requested change or replace the sample document.
- Expected
- The edit is allowed after send-back and the updated information appears on this building.
Unblocked by customer #108 — please retest.
No result has been recorded for CORRECT-13 yet.
CORRECT-14
Customer Not run- Do this
- Sign and send this building again.
- Expected
- The updated building returns to staff review and customer edits lock again.
Unblocked by customer #108 — please retest.
No result has been recorded for CORRECT-14 yet.
CORRECT-15
Staff Not run- Do this
- Reopen the same building on the staff portal.
- Expected
- Staff can see the new submission and the corrected information or replacement document.
Unblocked by customer #108 — please retest.
No result has been recorded for CORRECT-15 yet.
Before you start
0 of 4 completed, 2 blocked.
- P1_5-PREP-01: Not run P1_5-PREP-01 · Not run · ready
- P1_5-PREP-02: Blocked P1_5-PREP-02 · Blocked by customer #106
- P1_5-PREP-03: Blocked P1_5-PREP-03 · Blocked by customer #107
- P1_5-PREP-04: Not run P1_5-PREP-04 · Not run · ready
P1_5-PREP-01
Staff Not run- Do this
- Sign in to the live staff portal with your own account and open Tests.
- Expected
- Tests opens. Your name shows on the results you record.
No result has been recorded for P1_5-PREP-01 yet.
P1_5-PREP-02
Customer Blocked- Do this
- Sign in to the live customer portal as this phase's named test building owner.
- Expected
- You are signed in as the test owner, not as a real customer.
Blocked by customer #106.
No result has been recorded for P1_5-PREP-02 yet.
← P1_5-PREP-01 P1_5-PREP-03 → Open P1_5-PREP-02 on its own page
P1_5-PREP-03
Staff Blocked- Do this
- Get one pre-loaded test customer from the import, with an email inbox you can open.
- Expected
- The customer's record already holds an approved income qualification with a code.
Blocked by customer #107.
No result has been recorded for P1_5-PREP-03 yet.
← P1_5-PREP-02 P1_5-PREP-04 → Open P1_5-PREP-03 on its own page
P1_5-PREP-04
Staff Not run- Do this
- Write the case ID for each test of this phase in its first step's note.
- Expected
- Every test in this phase has a case ID that names its made-up records.
No result has been recorded for P1_5-PREP-04 yet.
First sign-in
0 of 6 completed, 6 blocked.
- P1_5-SETUP-01: Blocked P1_5-SETUP-01 · Blocked by customer #107
- P1_5-SETUP-02: Blocked P1_5-SETUP-02 · Blocked by customer #107
- P1_5-SETUP-03: Blocked P1_5-SETUP-03 · Blocked by customer #107
- P1_5-SETUP-04: Blocked P1_5-SETUP-04 · Blocked by customer #107
- P1_5-SETUP-05: Blocked P1_5-SETUP-05 · Blocked by customer #107
- P1_5-SETUP-06: Blocked P1_5-SETUP-06 · Blocked by customer #107
P1_5-SETUP-01
Customer Blocked- Do this
- Open the live customer portal in a fresh browser session and sign in with the pre-loaded email.
- Expected
- The portal knows the email and offers to set a password. It does not ask you to create an account.
Blocked by customer #107.
No result has been recorded for P1_5-SETUP-01 yet.
P1_5-SETUP-02
Customer Blocked- Do this
- Follow the set-a-password link sent to that email and choose a password.
- Expected
- The password is accepted and you land in the portal, signed in.
Blocked by customer #107.
No result has been recorded for P1_5-SETUP-02 yet.
← P1_5-SETUP-01 P1_5-SETUP-03 → Open P1_5-SETUP-02 on its own page
P1_5-SETUP-03
Customer Blocked- Do this
- Open your property without starting an application.
- Expected
- Your income qualification code and its expiry date show. You filled in no application.
Blocked by customer #107.
No result has been recorded for P1_5-SETUP-03 yet.
← P1_5-SETUP-02 P1_5-SETUP-04 → Open P1_5-SETUP-03 on its own page
P1_5-SETUP-04
Customer Blocked- Do this
- Sign out, then sign in again with the new password.
- Expected
- Sign-in works and the same code and expiry date show.
Blocked by customer #107.
No result has been recorded for P1_5-SETUP-04 yet.
← P1_5-SETUP-03 P1_5-SETUP-05 → Open P1_5-SETUP-04 on its own page
P1_5-SETUP-05
Staff Blocked- Do this
- On the live staff portal, find the same customer.
- Expected
- The account shows the same code and expiry date the customer sees.
Blocked by customer #107.
No result has been recorded for P1_5-SETUP-05 yet.
← P1_5-SETUP-04 P1_5-SETUP-06 → Open P1_5-SETUP-05 on its own page
P1_5-SETUP-06
Customer Blocked- Do this
- In a fresh browser session, try to create a new account with the pre-loaded email.
- Expected
- The portal says an account already exists and offers sign-in. No second account is made.
Blocked by customer #107.
No result has been recorded for P1_5-SETUP-06 yet.
Clean up
0 of 1 completed, 1 blocked.
- P1_5-CLEAN-01: Blocked P1_5-CLEAN-01 · Blocked by customer #106
P1_5-CLEAN-01
Staff Blocked- Do this
- Run the documented cleanup for this phase's test accounts, and record the before and after counts.
- Expected
- Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Blocked by customer #106.
No result has been recorded for P1_5-CLEAN-01 yet.
Before you start
0 of 4 completed, 1 blocked.
- P2-PREP-01: Not run P2-PREP-01 · Not run · ready
- P2-PREP-02: Blocked P2-PREP-02 · Blocked by customer #106
- P2-PREP-03: Not run P2-PREP-03 · Not run · ready
- P2-PREP-04: Not run P2-PREP-04 · Not run · ready
P2-PREP-01
Staff Not run- Do this
- Sign in to the live staff portal with your own account and open Tests.
- Expected
- Tests opens. Your name shows on the results you record.
No result has been recorded for P2-PREP-01 yet.
P2-PREP-02
Customer Blocked- Do this
- Sign in to the live customer portal as this phase's named test building owner.
- Expected
- You are signed in as the test owner, not as a real customer.
Blocked by customer #106.
No result has been recorded for P2-PREP-02 yet.
P2-PREP-03
Staff Not run- Do this
- Choose two made-up companies, labeled P2-APPROVE and P2-REFUSE, each with its own email inbox.
- Expected
- Each company has a unique name, address and contact email you can open.
No result has been recorded for P2-PREP-03 yet.
P2-PREP-04
Staff Not run- Do this
- Write the case ID for each test of this phase in its first step's note.
- Expected
- Every test in this phase has a case ID that names its made-up records.
No result has been recorded for P2-PREP-04 yet.
Register and approve
0 of 8 completed, 6 blocked.
- P2-REG-01: Not run P2-REG-01 · Not run · ready
- P2-REG-02: Not run P2-REG-02 · Not run · ready
- P2-REG-03: Blocked P2-REG-03 · Blocked by contractor #4
- P2-REG-04: Blocked P2-REG-04 · Blocked by contractor #80
- P2-REG-05: Blocked P2-REG-05 · Blocked by contractor #80
- P2-REG-06: Blocked P2-REG-06 · Blocked by contractor #66, contractor #78, contractor #80
- P2-REG-07: Blocked P2-REG-07 · Blocked by contractor #66, contractor #78, contractor #80, contractor #67
- P2-REG-08: Blocked P2-REG-08 · Blocked by contractor #4
P2-REG-01
Contractor Not run- Do this
- Open the live contractor portal's registration in a fresh browser session and register P2-APPROVE.
- Expected
- The registration asks for the company, its contacts, its services and its documents.
No result has been recorded for P2-REG-01 yet.
P2-REG-02
Contractor Not run- Do this
- Fill in every required field, upload harmless sample documents, and submit.
- Expected
- The portal confirms the registration was sent and shows it waiting for review.
No result has been recorded for P2-REG-02 yet.
P2-REG-03
Contractor Blocked- Do this
- Open P2-APPROVE's email inbox.
- Expected
- An email confirms the registration was received.
Blocked by contractor #4.
No result has been recorded for P2-REG-03 yet.
P2-REG-04
Staff Blocked- Do this
- On the live staff portal, open Contractors and find P2-APPROVE's registration.
- Expected
- The registration shows its documents and its checks, including the Do Not Pay check.
Blocked by contractor #80.
No result has been recorded for P2-REG-04 yet.
P2-REG-05
Staff Blocked- Do this
- Open each sample document from the registration.
- Expected
- Each document opens.
Blocked by contractor #80.
No result has been recorded for P2-REG-05 yet.
P2-REG-06
Staff Blocked- Do this
- Tick "reviewed all documents" and approve P2-APPROVE.
- Expected
- The approval saves and the registration shows Approved, with your name and the time.
Blocked by contractor #66, contractor #78, contractor #80.
No result has been recorded for P2-REG-06 yet.
P2-REG-07
Contractor Blocked- Do this
- Sign in to the live contractor portal as P2-APPROVE.
- Expected
- The company shows as approved and can start a project.
Blocked by contractor #66, contractor #78, contractor #80, contractor #67.
No result has been recorded for P2-REG-07 yet.
P2-REG-08
Contractor Blocked- Do this
- Open P2-APPROVE's email inbox.
- Expected
- An email says the company is approved.
Blocked by contractor #4.
No result has been recorded for P2-REG-08 yet.
Refuse
0 of 3 completed, 2 blocked.
- P2-REFUSE-01: Not run P2-REFUSE-01 · Not run · ready
- P2-REFUSE-02: Blocked P2-REFUSE-02 · Blocked by contractor #80
- P2-REFUSE-03: Blocked P2-REFUSE-03 · Blocked by contractor #80
P2-REFUSE-01
Contractor Not run- Do this
- Register P2-REFUSE the same way, with harmless sample documents.
- Expected
- The registration is sent and waits for review.
No result has been recorded for P2-REFUSE-01 yet.
P2-REFUSE-02
Staff Blocked- Do this
- On the live staff portal, refuse P2-REFUSE with a plain-language reason.
- Expected
- The refusal saves with its reason.
Blocked by contractor #80.
No result has been recorded for P2-REFUSE-02 yet.
← P2-REFUSE-01 P2-REFUSE-03 → Open P2-REFUSE-02 on its own page
P2-REFUSE-03
Contractor Blocked- Do this
- Sign in to the live contractor portal as P2-REFUSE.
- Expected
- The company shows Not approved with the reason, and cannot start a project.
Blocked by contractor #80.
No result has been recorded for P2-REFUSE-03 yet.
Pre-loaded contractor
0 of 1 completed, 1 blocked.
- P2-IMPORT-01: Blocked P2-IMPORT-01 · Blocked by contractor #67, RnD #53 milestone 3
P2-IMPORT-01
Contractor Blocked- Do this
- Sign in to the live contractor portal as a contractor pre-loaded from CLEAResult's approved list.
- Expected
- Sign-in works and the company is already approved. It was not asked to register again.
Blocked by contractor #67, RnD #53 milestone 3.
No result has been recorded for P2-IMPORT-01 yet.
Clean up
0 of 1 completed, 1 blocked.
- P2-CLEAN-01: Blocked P2-CLEAN-01 · Blocked by customer #106
P2-CLEAN-01
Staff Blocked- Do this
- Run the documented cleanup for this phase's test accounts, and record the before and after counts.
- Expected
- Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Blocked by customer #106.
No result has been recorded for P2-CLEAN-01 yet.
Before you start
0 of 5 completed, 3 blocked.
- P3-PREP-01: Not run P3-PREP-01 · Not run · ready
- P3-PREP-02: Blocked P3-PREP-02 · Blocked by customer #106
- P3-PREP-03: Blocked P3-PREP-03 · Blocked by customer #106
- P3-PREP-04: Blocked P3-PREP-04 · Blocked by contractor #66, contractor #78, contractor #80
- P3-PREP-05: Not run P3-PREP-05 · Not run · ready
P3-PREP-01
Staff Not run- Do this
- Sign in to the live staff portal with your own account and open Tests.
- Expected
- Tests opens. Your name shows on the results you record.
No result has been recorded for P3-PREP-01 yet.
P3-PREP-02
Customer Blocked- Do this
- Sign in to the live customer portal as this phase's named test building owner.
- Expected
- You are signed in as the test owner, not as a real customer.
Blocked by customer #106.
No result has been recorded for P3-PREP-02 yet.
P3-PREP-03
Customer Blocked- Do this
- As the test owner, open a building approved in Phase 1.
- Expected
- The building shows Approved, with its code and valid-until date.
Blocked by customer #106. Already shipped: customer #108.
No result has been recorded for P3-PREP-03 yet.
P3-PREP-04
Contractor Blocked- Do this
- Sign in to the live contractor portal as the test contractor approved in Phase 2.
- Expected
- The company shows as approved and can start a project.
Blocked by contractor #66, contractor #78, contractor #80.
No result has been recorded for P3-PREP-04 yet.
P3-PREP-05
Staff Not run- Do this
- Write the case ID for each test of this phase in its first step's note.
- Expected
- Every test in this phase has a case ID that names its made-up records.
No result has been recorded for P3-PREP-05 yet.
Customer's code
0 of 7 completed, 6 blocked.
- P3-CODE-01: Not run P3-CODE-01 · Not run · unblocked by customer #108, please retest
- P3-CODE-02: Blocked P3-CODE-02 · Blocked by contractor #79, contractor #76
- P3-CODE-03: Blocked P3-CODE-03 · Blocked by contractor #79, contractor #76
- P3-CODE-04: Blocked P3-CODE-04 · Blocked by contractor #79, contractor #76
- P3-CODE-05: Blocked P3-CODE-05 · Blocked by contractor #79, contractor #76
- P3-CODE-06: Blocked P3-CODE-06 · Blocked by contractor #79, customer #96, customer #97
- P3-CODE-07: Blocked P3-CODE-07 · Blocked by customer #96, customer #97
P3-CODE-01
Customer Not run- Do this
- On the approved building, find its building code.
- Expected
- The code is LEA- or MEA- plus ten digits, with its valid-until date.
Unblocked by customer #108 — please retest.
No result has been recorded for P3-CODE-01 yet.
P3-CODE-02
Contractor Blocked- Do this
- On the live contractor portal, look up a building and type that code.
- Expected
- That building shows: its name, address and units. No other building or household shows.
Blocked by contractor #79, contractor #76.
No result has been recorded for P3-CODE-02 yet.
P3-CODE-03
Contractor Blocked- Do this
- Type the same code in lower case and without the dash.
- Expected
- The same building is found.
Blocked by contractor #79, contractor #76.
No result has been recorded for P3-CODE-03 yet.
P3-CODE-04
Contractor Blocked- Do this
- Type a made-up code of the same shape.
- Expected
- The portal says no building has that code. Nothing else shows.
Blocked by contractor #79, contractor #76.
No result has been recorded for P3-CODE-04 yet.
P3-CODE-05
Contractor Blocked- Do this
- Type an expired code (staff can give you one).
- Expected
- The portal refuses it and says the code has expired.
Blocked by contractor #79, contractor #76.
No result has been recorded for P3-CODE-05 yet.
P3-CODE-06
Contractor Blocked- Do this
- Start a multifamily project from the building you found.
- Expected
- The project is made and linked to that building.
Blocked by contractor #79, customer #96, customer #97.
No result has been recorded for P3-CODE-06 yet.
P3-CODE-07
Customer Blocked- Do this
- As the test owner, open the building again.
- Expected
- The contractor's project shows on the building.
Blocked by customer #96, customer #97.
No result has been recorded for P3-CODE-07 yet.
Contractor's invite link
0 of 4 completed, 4 blocked.
- P3-INVITE-01: Blocked P3-INVITE-01 · Blocked by contractor #79
- P3-INVITE-02: Blocked P3-INVITE-02 · Blocked by contractor #79, customer #96
- P3-INVITE-03: Blocked P3-INVITE-03 · Blocked by customer #96, customer #97, contractor #79
- P3-INVITE-04: Blocked P3-INVITE-04 · Blocked by customer #96, customer #97
P3-INVITE-01
Contractor Blocked- Do this
- Start a multifamily project with no building yet.
- Expected
- The project gets a PRJ- code and says it is waiting for the customer to link it. It cannot be submitted.
Blocked by contractor #79.
No result has been recorded for P3-INVITE-01 yet.
P3-INVITE-02
Contractor Blocked- Do this
- Email an invite for that project to the test owner's email.
- Expected
- An invite email arrives with a single-use link.
Blocked by contractor #79, customer #96.
No result has been recorded for P3-INVITE-02 yet.
← P3-INVITE-01 P3-INVITE-03 → Open P3-INVITE-02 on its own page
P3-INVITE-03
Customer Blocked- Do this
- Open the invite link, sign in as the test owner, and link the project to the approved building.
- Expected
- The project shows on the building. The contractor's project shows as linked.
Blocked by customer #96, customer #97, contractor #79.
No result has been recorded for P3-INVITE-03 yet.
← P3-INVITE-02 P3-INVITE-04 → Open P3-INVITE-03 on its own page
P3-INVITE-04
Customer Blocked- Do this
- Open the same invite link again.
- Expected
- The portal says the link has already been used.
Blocked by customer #96, customer #97.
No result has been recorded for P3-INVITE-04 yet.
Clean up
0 of 1 completed, 1 blocked.
- P3-CLEAN-01: Blocked P3-CLEAN-01 · Blocked by customer #106
P3-CLEAN-01
Staff Blocked- Do this
- Run the documented cleanup for this phase's test accounts, and record the before and after counts.
- Expected
- Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Blocked by customer #106.
No result has been recorded for P3-CLEAN-01 yet.
Before you start
0 of 5 completed, 3 blocked.
- P4-PREP-01: Not run P4-PREP-01 · Not run · ready
- P4-PREP-02: Blocked P4-PREP-02 · Blocked by customer #106
- P4-PREP-03: Blocked P4-PREP-03 · Blocked by customer #106
- P4-PREP-04: Blocked P4-PREP-04 · Blocked by contractor #66, contractor #78, contractor #80
- P4-PREP-05: Not run P4-PREP-05 · Not run · ready
P4-PREP-01
Staff Not run- Do this
- Sign in to the live staff portal with your own account and open Tests.
- Expected
- Tests opens. Your name shows on the results you record.
No result has been recorded for P4-PREP-01 yet.
P4-PREP-02
Customer Blocked- Do this
- Sign in to the live customer portal as this phase's named test building owner.
- Expected
- You are signed in as the test owner, not as a real customer.
Blocked by customer #106.
No result has been recorded for P4-PREP-02 yet.
P4-PREP-03
Customer Blocked- Do this
- As the test owner, open a building approved in Phase 1.
- Expected
- The building shows Approved, with its code.
Blocked by customer #106. Already shipped: customer #108.
No result has been recorded for P4-PREP-03 yet.
P4-PREP-04
Contractor Blocked- Do this
- Sign in to the live contractor portal as the test contractor approved in Phase 2.
- Expected
- The company shows as approved and can start a project.
Blocked by contractor #66, contractor #78, contractor #80.
No result has been recorded for P4-PREP-04 yet.
P4-PREP-05
Staff Not run- Do this
- Write the case ID for each test of this phase in its first step's note.
- Expected
- Every test in this phase has a case ID that names its made-up records.
No result has been recorded for P4-PREP-05 yet.
Approve
0 of 7 completed, 6 blocked.
- P4-APPROVE-01: Blocked P4-APPROVE-01 · Blocked by contractor #79
- P4-APPROVE-02: Blocked P4-APPROVE-02 · Blocked by contractor #63
- P4-APPROVE-03: Blocked P4-APPROVE-03 · Blocked by contractor #80
- P4-APPROVE-04: Blocked P4-APPROVE-04 · Blocked by contractor #80
- P4-APPROVE-05: Blocked P4-APPROVE-05 · Blocked by contractor #80
- P4-APPROVE-06: Not run P4-APPROVE-06 · Not run · unblocked by customer #108, please retest
- P4-APPROVE-07: Blocked P4-APPROVE-07 · Blocked by contractor #80
P4-APPROVE-01
Contractor Blocked- Do this
- Start a multifamily HOMES or HEAR project on the approved building, for P4-APPROVE.
- Expected
- The building's code fills in by itself and cannot be changed to another building's.
Blocked by contractor #79.
No result has been recorded for P4-APPROVE-01 yet.
P4-APPROVE-02
Contractor Blocked- Do this
- Fill in every required field, add harmless sample documents, and submit the reservation.
- Expected
- The portal confirms it was submitted and shows it waiting for review.
Blocked by contractor #63.
No result has been recorded for P4-APPROVE-02 yet.
← P4-APPROVE-01 P4-APPROVE-03 → Open P4-APPROVE-02 on its own page
P4-APPROVE-03
Staff Blocked- Do this
- On the live staff portal, find this project.
- Expected
- It shows with its building and code.
Blocked by contractor #80.
No result has been recorded for P4-APPROVE-03 yet.
← P4-APPROVE-02 P4-APPROVE-04 → Open P4-APPROVE-03 on its own page
P4-APPROVE-04
Staff Blocked- Do this
- Work the reservation review checklist, item by item.
- Expected
- Each item saves with your name.
Blocked by contractor #80. Already shipped: customer #108.
No result has been recorded for P4-APPROVE-04 yet.
← P4-APPROVE-03 P4-APPROVE-05 → Open P4-APPROVE-04 on its own page
P4-APPROVE-05
Staff Blocked- Do this
- Approve the reservation.
- Expected
- The approval saves and the offer letter is recorded.
Blocked by contractor #80. Already shipped: customer #108.
No result has been recorded for P4-APPROVE-05 yet.
← P4-APPROVE-04 P4-APPROVE-06 → Open P4-APPROVE-05 on its own page
P4-APPROVE-06
Customer Not run- Do this
- As the test owner, open the building's project. No email is sent today, so check the page.
- Expected
- The status timeline shows Reserved / Project Approved.
Unblocked by customer #108 — please retest.
No result has been recorded for P4-APPROVE-06 yet.
← P4-APPROVE-05 P4-APPROVE-07 → Open P4-APPROVE-06 on its own page
P4-APPROVE-07
Contractor Blocked- Do this
- Open the project on the contractor portal.
- Expected
- The project shows as approved.
Blocked by contractor #80. Already shipped: customer #108.
No result has been recorded for P4-APPROVE-07 yet.
Deny
0 of 6 completed, 5 blocked.
- P4-DENY-01: Blocked P4-DENY-01 · Blocked by contractor #79
- P4-DENY-02: Blocked P4-DENY-02 · Blocked by contractor #63
- P4-DENY-03: Blocked P4-DENY-03 · Blocked by contractor #80
- P4-DENY-04: Blocked P4-DENY-04 · Blocked by contractor #80
- P4-DENY-05: Not run P4-DENY-05 · Not run · unblocked by customer #108, please retest
- P4-DENY-06: Blocked P4-DENY-06 · Blocked by contractor #80
P4-DENY-01
Contractor Blocked- Do this
- Start a multifamily HOMES or HEAR project on the approved building, for P4-DENY.
- Expected
- The building's code fills in by itself and cannot be changed to another building's.
Blocked by contractor #79.
No result has been recorded for P4-DENY-01 yet.
P4-DENY-02
Contractor Blocked- Do this
- Fill in every required field, add harmless sample documents, and submit the reservation.
- Expected
- The portal confirms it was submitted and shows it waiting for review.
Blocked by contractor #63.
No result has been recorded for P4-DENY-02 yet.
P4-DENY-03
Staff Blocked- Do this
- On the live staff portal, find this project.
- Expected
- It shows with its building and code.
Blocked by contractor #80.
No result has been recorded for P4-DENY-03 yet.
P4-DENY-04
Staff Blocked- Do this
- Deny the reservation with a plain-language reason.
- Expected
- The denial saves with its reason.
Blocked by contractor #80. Already shipped: customer #108.
No result has been recorded for P4-DENY-04 yet.
P4-DENY-05
Customer Not run- Do this
- As the test owner, open the building's project.
- Expected
- It shows Not approved and the reason.
Unblocked by customer #108 — please retest.
No result has been recorded for P4-DENY-05 yet.
P4-DENY-06
Contractor Blocked- Do this
- Open the project on the contractor portal.
- Expected
- It shows Not approved and the reason.
Blocked by contractor #80. Already shipped: customer #108.
No result has been recorded for P4-DENY-06 yet.
Send back
0 of 7 completed, 7 blocked.
- P4-CORRECT-01: Blocked P4-CORRECT-01 · Blocked by contractor #79
- P4-CORRECT-02: Blocked P4-CORRECT-02 · Blocked by contractor #63
- P4-CORRECT-03: Blocked P4-CORRECT-03 · Blocked by contractor #80
- P4-CORRECT-04: Blocked P4-CORRECT-04 · Blocked by contractor #80
- P4-CORRECT-05: Blocked P4-CORRECT-05 · Blocked by contractor #80
- P4-CORRECT-06: Blocked P4-CORRECT-06 · Blocked by contractor #80
- P4-CORRECT-07: Blocked P4-CORRECT-07 · Blocked by contractor #80
P4-CORRECT-01
Contractor Blocked- Do this
- Start a multifamily HOMES or HEAR project on the approved building, for P4-CORRECT.
- Expected
- The building's code fills in by itself and cannot be changed to another building's.
Blocked by contractor #79.
No result has been recorded for P4-CORRECT-01 yet.
P4-CORRECT-02
Contractor Blocked- Do this
- Fill in every required field, add harmless sample documents, and submit the reservation.
- Expected
- The portal confirms it was submitted and shows it waiting for review.
Blocked by contractor #63.
No result has been recorded for P4-CORRECT-02 yet.
← P4-CORRECT-01 P4-CORRECT-03 → Open P4-CORRECT-02 on its own page
P4-CORRECT-03
Staff Blocked- Do this
- On the live staff portal, find this project.
- Expected
- It shows with its building and code.
Blocked by contractor #80.
No result has been recorded for P4-CORRECT-03 yet.
← P4-CORRECT-02 P4-CORRECT-04 → Open P4-CORRECT-03 on its own page
P4-CORRECT-04
Staff Blocked- Do this
- Send the reservation back with one specific request.
- Expected
- The send-back saves with the request.
Blocked by contractor #80. Already shipped: customer #108.
No result has been recorded for P4-CORRECT-04 yet.
← P4-CORRECT-03 P4-CORRECT-05 → Open P4-CORRECT-04 on its own page
P4-CORRECT-05
Contractor Blocked- Do this
- Open the project on the contractor portal.
- Expected
- It shows Sent back and the request.
Blocked by contractor #80. Already shipped: customer #108.
No result has been recorded for P4-CORRECT-05 yet.
← P4-CORRECT-04 P4-CORRECT-06 → Open P4-CORRECT-05 on its own page
P4-CORRECT-06
Contractor Blocked- Do this
- Make the requested change and send it again.
- Expected
- It shows waiting for review again.
Blocked by contractor #80.
No result has been recorded for P4-CORRECT-06 yet.
← P4-CORRECT-05 P4-CORRECT-07 → Open P4-CORRECT-06 on its own page
P4-CORRECT-07
Staff Blocked- Do this
- Reopen the project on the staff portal.
- Expected
- Staff see the changed submission.
Blocked by contractor #80.
No result has been recorded for P4-CORRECT-07 yet.
Clean up
0 of 1 completed, 1 blocked.
- P4-CLEAN-01: Blocked P4-CLEAN-01 · Blocked by customer #106
P4-CLEAN-01
Staff Blocked- Do this
- Run the documented cleanup for this phase's test accounts, and record the before and after counts.
- Expected
- Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Blocked by customer #106.
No result has been recorded for P4-CLEAN-01 yet.
Before you start
0 of 5 completed, 2 blocked.
- P5-PREP-01: Not run P5-PREP-01 · Not run · ready
- P5-PREP-02: Blocked P5-PREP-02 · Blocked by customer #106
- P5-PREP-03: Blocked P5-PREP-03 · Blocked by contractor #66, contractor #78, contractor #80
- P5-PREP-04: Not run P5-PREP-04 · Not run · unblocked by customer #108, please retest
- P5-PREP-05: Not run P5-PREP-05 · Not run · ready
P5-PREP-01
Staff Not run- Do this
- Sign in to the live staff portal with your own account and open Tests.
- Expected
- Tests opens. Your name shows on the results you record.
No result has been recorded for P5-PREP-01 yet.
P5-PREP-02
Customer Blocked- Do this
- Sign in to the live customer portal as this phase's named test building owner.
- Expected
- You are signed in as the test owner, not as a real customer.
Blocked by customer #106.
No result has been recorded for P5-PREP-02 yet.
P5-PREP-03
Contractor Blocked- Do this
- Sign in to the live contractor portal as the test contractor approved in Phase 2.
- Expected
- The company shows as approved and can start a project.
Blocked by contractor #66, contractor #78, contractor #80.
No result has been recorded for P5-PREP-03 yet.
P5-PREP-04
Contractor Not run- Do this
- Open the project approved in Phase 4.
- Expected
- The project shows as approved.
Unblocked by customer #108 — please retest.
No result has been recorded for P5-PREP-04 yet.
P5-PREP-05
Staff Not run- Do this
- Write the case ID for each test of this phase in its first step's note.
- Expected
- Every test in this phase has a case ID that names its made-up records.
No result has been recorded for P5-PREP-05 yet.
Submit for payment
0 of 5 completed, 4 blocked.
- P5-SUBMIT-01: Blocked P5-SUBMIT-01 · Blocked by contractor #63
- P5-SUBMIT-02: Blocked P5-SUBMIT-02 · Blocked by contractor #63
- P5-SUBMIT-03: Not run P5-SUBMIT-03 · Not run · ready
- P5-SUBMIT-04: Blocked P5-SUBMIT-04 · Blocked by contractor #80
- P5-SUBMIT-05: Blocked P5-SUBMIT-05 · Blocked by contractor #63, contractor #80
P5-SUBMIT-01
Contractor Blocked- Do this
- Upload the final evidence: completion documents, the final invoice and install photos (harmless samples).
- Expected
- Each upload is listed against the project.
Blocked by contractor #63.
No result has been recorded for P5-SUBMIT-01 yet.
P5-SUBMIT-02
Contractor Blocked- Do this
- Submit the project for payment.
- Expected
- The portal confirms it and shows the payment request waiting for review.
Blocked by contractor #63.
No result has been recorded for P5-SUBMIT-02 yet.
← P5-SUBMIT-01 P5-SUBMIT-03 → Open P5-SUBMIT-02 on its own page
P5-SUBMIT-03
Customer Not run- Do this
- As the test owner, open the building's project.
- Expected
- It shows the work is complete and waiting for payment review.
No result has been recorded for P5-SUBMIT-03 yet.
← P5-SUBMIT-02 P5-SUBMIT-04 → Open P5-SUBMIT-03 on its own page
P5-SUBMIT-04
Staff Blocked- Do this
- On the live staff portal, find the payment request.
- Expected
- It shows in the redemption review, with the project and building.
Blocked by contractor #80.
No result has been recorded for P5-SUBMIT-04 yet.
← P5-SUBMIT-03 P5-SUBMIT-05 → Open P5-SUBMIT-04 on its own page
P5-SUBMIT-05
Staff Blocked- Do this
- Open each uploaded document.
- Expected
- Each document opens.
Blocked by contractor #63, contractor #80.
No result has been recorded for P5-SUBMIT-05 yet.
Clean up
0 of 1 completed, 1 blocked.
- P5-CLEAN-01: Blocked P5-CLEAN-01 · Blocked by customer #106
P5-CLEAN-01
Staff Blocked- Do this
- Run the documented cleanup for this phase's test accounts, and record the before and after counts.
- Expected
- Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Blocked by customer #106.
No result has been recorded for P5-CLEAN-01 yet.
Before you start
0 of 4 completed, 2 blocked.
- P5_5-PREP-01: Not run P5_5-PREP-01 · Not run · ready
- P5_5-PREP-02: Blocked P5_5-PREP-02 · Blocked by customer #106
- P5_5-PREP-03: Blocked P5_5-PREP-03 · Blocked by contractor #63
- P5_5-PREP-04: Not run P5_5-PREP-04 · Not run · ready
P5_5-PREP-01
Staff Not run- Do this
- Sign in to the live staff portal with your own account and open Tests.
- Expected
- Tests opens. Your name shows on the results you record.
No result has been recorded for P5_5-PREP-01 yet.
P5_5-PREP-02
Customer Blocked- Do this
- Sign in to the live customer portal as this phase's named test building owner.
- Expected
- You are signed in as the test owner, not as a real customer.
Blocked by customer #106.
No result has been recorded for P5_5-PREP-02 yet.
← P5_5-PREP-01 P5_5-PREP-03 → Open P5_5-PREP-02 on its own page
P5_5-PREP-03
Staff Blocked- Do this
- Find the payment request submitted in Phase 5.
- Expected
- It shows waiting for review.
Blocked by contractor #63.
No result has been recorded for P5_5-PREP-03 yet.
← P5_5-PREP-02 P5_5-PREP-04 → Open P5_5-PREP-03 on its own page
P5_5-PREP-04
Staff Not run- Do this
- Write the case ID for each test of this phase in its first step's note.
- Expected
- Every test in this phase has a case ID that names its made-up records.
No result has been recorded for P5_5-PREP-04 yet.
Quality visit
0 of 8 completed.
- P5_5-VISIT-01: Not run P5_5-VISIT-01 · Not run · ready
- P5_5-VISIT-02: Not run P5_5-VISIT-02 · Not run · ready
- P5_5-VISIT-03: Not run P5_5-VISIT-03 · Not run · ready
- P5_5-VISIT-04: Not run P5_5-VISIT-04 · Not run · ready
- P5_5-VISIT-05: Not run P5_5-VISIT-05 · Not run · ready
- P5_5-VISIT-06: Not run P5_5-VISIT-06 · Not run · ready
- P5_5-VISIT-07: Not run P5_5-VISIT-07 · Not run · ready
- P5_5-VISIT-08: Not run P5_5-VISIT-08 · Not run · ready
P5_5-VISIT-01
Staff Not run- Do this
- Pick the project for a quality visit.
- Expected
- The visit shows Waiting to be scheduled.
No result has been recorded for P5_5-VISIT-01 yet.
P5_5-VISIT-02
Customer Not run- Do this
- As the test owner, open the project.
- Expected
- It shows the visit is waiting to be scheduled, and who to contact.
No result has been recorded for P5_5-VISIT-02 yet.
← P5_5-VISIT-01 P5_5-VISIT-03 → Open P5_5-VISIT-02 on its own page
P5_5-VISIT-03
Staff Not run- Do this
- Book a time for the visit.
- Expected
- The visit shows Scheduled, with the time.
No result has been recorded for P5_5-VISIT-03 yet.
← P5_5-VISIT-02 P5_5-VISIT-04 → Open P5_5-VISIT-03 on its own page
P5_5-VISIT-04
Customer Not run- Do this
- As the test owner, open the project.
- Expected
- It shows the booked date and time.
No result has been recorded for P5_5-VISIT-04 yet.
← P5_5-VISIT-03 P5_5-VISIT-05 → Open P5_5-VISIT-04 on its own page
P5_5-VISIT-05
Staff Not run- Do this
- Move the visit to a new time.
- Expected
- The new time is the visit's time. The old one is kept in the history.
No result has been recorded for P5_5-VISIT-05 yet.
← P5_5-VISIT-04 P5_5-VISIT-06 → Open P5_5-VISIT-05 on its own page
P5_5-VISIT-06
Customer Not run- Do this
- As the test owner, open the project.
- Expected
- Only the new time shows as the visit's time.
No result has been recorded for P5_5-VISIT-06 yet.
← P5_5-VISIT-05 P5_5-VISIT-07 → Open P5_5-VISIT-06 on its own page
P5_5-VISIT-07
Staff Not run- Do this
- Record the visit's result.
- Expected
- The visit shows Complete with its result.
No result has been recorded for P5_5-VISIT-07 yet.
← P5_5-VISIT-06 P5_5-VISIT-08 → Open P5_5-VISIT-07 on its own page
P5_5-VISIT-08
Customer Not run- Do this
- As the test owner, open the project.
- Expected
- The visit shows Complete.
No result has been recorded for P5_5-VISIT-08 yet.
Automatic picking
0 of 4 completed, 4 blocked.
- P5_5-PICK-01: Blocked P5_5-PICK-01 · Blocked by staff #208
- P5_5-PICK-02: Blocked P5_5-PICK-02 · Blocked by staff #208
- P5_5-PICK-03: Blocked P5_5-PICK-03 · Blocked by staff #208
- P5_5-PICK-04: Blocked P5_5-PICK-04 · Blocked by staff #208
P5_5-PICK-01
Staff Blocked- Do this
- Open Automatic quality-visit picks and check one contractor's first five finished projects.
- Expected
- All five were picked without anyone choosing them.
Blocked by staff #208.
No result has been recorded for P5_5-PICK-01 yet.
P5_5-PICK-02
Staff Blocked- Do this
- Check that contractor's finished projects after their first five.
- Expected
- At least 5% of them were picked at random.
Blocked by staff #208.
No result has been recorded for P5_5-PICK-02 yet.
← P5_5-PICK-01 P5_5-PICK-03 → Open P5_5-PICK-02 on its own page
P5_5-PICK-03
Staff Blocked- Do this
- Check a finished project with a rebate of $40,000 or more.
- Expected
- It was picked without anyone choosing it.
Blocked by staff #208.
No result has been recorded for P5_5-PICK-03 yet.
← P5_5-PICK-02 P5_5-PICK-04 → Open P5_5-PICK-03 on its own page
P5_5-PICK-04
Staff Blocked- Do this
- Check a project finished after that contractor had a visit with items to resolve.
- Expected
- It was picked without anyone choosing it.
Blocked by staff #208.
No result has been recorded for P5_5-PICK-04 yet.
Clean up
0 of 1 completed, 1 blocked.
- P5_5-CLEAN-01: Blocked P5_5-CLEAN-01 · Blocked by customer #106
P5_5-CLEAN-01
Staff Blocked- Do this
- Run the documented cleanup for this phase's test accounts, and record the before and after counts.
- Expected
- Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Blocked by customer #106.
No result has been recorded for P5_5-CLEAN-01 yet.
Before you start
0 of 5 completed, 3 blocked.
- P6-PREP-01: Not run P6-PREP-01 · Not run · ready
- P6-PREP-02: Blocked P6-PREP-02 · Blocked by customer #106
- P6-PREP-03: Blocked P6-PREP-03 · Blocked by contractor #66, contractor #78, contractor #80
- P6-PREP-04: Blocked P6-PREP-04 · Blocked by contractor #63
- P6-PREP-05: Not run P6-PREP-05 · Not run · ready
P6-PREP-01
Staff Not run- Do this
- Sign in to the live staff portal with your own account and open Tests.
- Expected
- Tests opens. Your name shows on the results you record.
No result has been recorded for P6-PREP-01 yet.
P6-PREP-02
Customer Blocked- Do this
- Sign in to the live customer portal as this phase's named test building owner.
- Expected
- You are signed in as the test owner, not as a real customer.
Blocked by customer #106.
No result has been recorded for P6-PREP-02 yet.
P6-PREP-03
Contractor Blocked- Do this
- Sign in to the live contractor portal as the test contractor approved in Phase 2.
- Expected
- The company shows as approved and can start a project.
Blocked by contractor #66, contractor #78, contractor #80.
No result has been recorded for P6-PREP-03 yet.
P6-PREP-04
Staff Blocked- Do this
- Have a separate payment request ready for each test, each on its own approved project.
- Expected
- Three payment requests wait for review, labeled P6-APPROVE, P6-CORRECT and P6-REFUSE.
Blocked by contractor #63.
No result has been recorded for P6-PREP-04 yet.
P6-PREP-05
Staff Not run- Do this
- Write the case ID for each test of this phase in its first step's note.
- Expected
- Every test in this phase has a case ID that names its made-up records.
No result has been recorded for P6-PREP-05 yet.
Approve and pay
0 of 6 completed, 3 blocked.
- P6-APPROVE-01: Blocked P6-APPROVE-01 · Blocked by contractor #80
- P6-APPROVE-02: Blocked P6-APPROVE-02 · Blocked by contractor #80
- P6-APPROVE-03: Not run P6-APPROVE-03 · Not run · ready
- P6-APPROVE-04: Not run P6-APPROVE-04 · Not run · ready
- P6-APPROVE-05: Not run P6-APPROVE-05 · Not run · ready
- P6-APPROVE-06: Blocked P6-APPROVE-06 · Blocked by contractor #80
P6-APPROVE-01
Staff Blocked- Do this
- Open P6-APPROVE's redemption review and check the completion documents, invoice lines and photos.
- Expected
- Each check saves with your name.
Blocked by contractor #80.
No result has been recorded for P6-APPROVE-01 yet.
P6-APPROVE-02
Staff Blocked- Do this
- Pass the redemption review.
- Expected
- It moves to the payment review.
Blocked by contractor #80.
No result has been recorded for P6-APPROVE-02 yet.
← P6-APPROVE-01 P6-APPROVE-03 → Open P6-APPROVE-02 on its own page
P6-APPROVE-03
Staff Not run- Do this
- Work the payment review: duplicate check, savings, invoice and contractor checks. Approve it.
- Expected
- The payment review saves as approved.
No result has been recorded for P6-APPROVE-03 yet.
← P6-APPROVE-02 P6-APPROVE-04 → Open P6-APPROVE-03 on its own page
P6-APPROVE-04
Staff Not run- Do this
- Once SPECTRUM has paid it, mark the rebate Paid with its payment date.
- Expected
- The project shows Paid.
No result has been recorded for P6-APPROVE-04 yet.
← P6-APPROVE-03 P6-APPROVE-05 → Open P6-APPROVE-04 on its own page
P6-APPROVE-05
Customer Not run- Do this
- As the test owner, open the project.
- Expected
- It shows Paid.
No result has been recorded for P6-APPROVE-05 yet.
← P6-APPROVE-04 P6-APPROVE-06 → Open P6-APPROVE-05 on its own page
P6-APPROVE-06
Contractor Blocked- Do this
- Open the project on the contractor portal.
- Expected
- It shows Paid.
Blocked by contractor #80.
No result has been recorded for P6-APPROVE-06 yet.
Send back
0 of 4 completed, 4 blocked.
- P6-CORRECT-01: Blocked P6-CORRECT-01 · Blocked by contractor #80
- P6-CORRECT-02: Blocked P6-CORRECT-02 · Blocked by contractor #80
- P6-CORRECT-03: Blocked P6-CORRECT-03 · Blocked by contractor #63, contractor #80
- P6-CORRECT-04: Blocked P6-CORRECT-04 · Blocked by contractor #80
P6-CORRECT-01
Staff Blocked- Do this
- Send P6-CORRECT's redemption back with one named problem.
- Expected
- The send-back saves with the problem.
Blocked by contractor #80.
No result has been recorded for P6-CORRECT-01 yet.
P6-CORRECT-02
Contractor Blocked- Do this
- Open the project on the contractor portal.
- Expected
- It shows Sent back and the problem.
Blocked by contractor #80.
No result has been recorded for P6-CORRECT-02 yet.
← P6-CORRECT-01 P6-CORRECT-03 → Open P6-CORRECT-02 on its own page
P6-CORRECT-03
Contractor Blocked- Do this
- Fix the problem and send it again.
- Expected
- It shows waiting for review again.
Blocked by contractor #63, contractor #80.
No result has been recorded for P6-CORRECT-03 yet.
← P6-CORRECT-02 P6-CORRECT-04 → Open P6-CORRECT-03 on its own page
P6-CORRECT-04
Staff Blocked- Do this
- Reopen the redemption review.
- Expected
- Staff see the changed submission.
Blocked by contractor #80.
No result has been recorded for P6-CORRECT-04 yet.
Refuse
0 of 3 completed, 2 blocked.
- P6-REFUSE-01: Blocked P6-REFUSE-01 · Blocked by contractor #80
- P6-REFUSE-02: Not run P6-REFUSE-02 · Not run · ready
- P6-REFUSE-03: Blocked P6-REFUSE-03 · Blocked by contractor #80
P6-REFUSE-01
Staff Blocked- Do this
- Refuse P6-REFUSE's payment with a plain-language reason.
- Expected
- The refusal saves with its reason.
Blocked by contractor #80.
No result has been recorded for P6-REFUSE-01 yet.
P6-REFUSE-02
Customer Not run- Do this
- As the test owner, open the project.
- Expected
- It shows Not paid and the reason.
No result has been recorded for P6-REFUSE-02 yet.
← P6-REFUSE-01 P6-REFUSE-03 → Open P6-REFUSE-02 on its own page
P6-REFUSE-03
Contractor Blocked- Do this
- Open the project on the contractor portal.
- Expected
- It shows Not paid and the reason.
Blocked by contractor #80.
No result has been recorded for P6-REFUSE-03 yet.
Clean up
0 of 1 completed, 1 blocked.
- P6-CLEAN-01: Blocked P6-CLEAN-01 · Blocked by customer #106
P6-CLEAN-01
Staff Blocked- Do this
- Run the documented cleanup for this phase's test accounts, and record the before and after counts.
- Expected
- Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Blocked by customer #106.
No result has been recorded for P6-CLEAN-01 yet.
Before you start
0 of 4 completed, 1 blocked.
- P7-PREP-01: Not run P7-PREP-01 · Not run · ready
- P7-PREP-02: Blocked P7-PREP-02 · Blocked by customer #106
- P7-PREP-03: Not run P7-PREP-03 · Not run · unblocked by customer #108, please retest
- P7-PREP-04: Not run P7-PREP-04 · Not run · ready
P7-PREP-01
Staff Not run- Do this
- Sign in to the live staff portal with your own account and open Tests.
- Expected
- Tests opens. Your name shows on the results you record.
No result has been recorded for P7-PREP-01 yet.
P7-PREP-02
Customer Blocked- Do this
- Sign in to the live customer portal as this phase's named test building owner.
- Expected
- You are signed in as the test owner, not as a real customer.
Blocked by customer #106.
No result has been recorded for P7-PREP-02 yet.
P7-PREP-03
Staff Not run- Do this
- Check that Phases 4 to 6 left at least one paid test project.
- Expected
- At least one test project shows Paid.
Unblocked by customer #108 — please retest.
No result has been recorded for P7-PREP-03 yet.
P7-PREP-04
Staff Not run- Do this
- Write the case ID for each test of this phase in its first step's note.
- Expected
- Every test in this phase has a case ID that names its made-up records.
No result has been recorded for P7-PREP-04 yet.
DOE bulk report
0 of 4 completed, 4 blocked.
- P7-REPORT-01: Blocked P7-REPORT-01 · Blocked by RnD #31, RnD #53 milestone 7
- P7-REPORT-02: Blocked P7-REPORT-02 · Blocked by RnD #31, RnD #53 milestone 7
- P7-REPORT-03: Blocked P7-REPORT-03 · Blocked by RnD #31, RnD #53 milestone 7
- P7-REPORT-04: Blocked P7-REPORT-04 · Blocked by RnD #31, RnD #53 milestone 7, customer #106
P7-REPORT-01
Staff Blocked- Do this
- On the live staff portal, download the DOE bulk report for HOMES and HEAR, multifamily first.
- Expected
- A spreadsheet file downloads.
Blocked by RnD #31, RnD #53 milestone 7.
No result has been recorded for P7-REPORT-01 yet.
P7-REPORT-02
Staff Blocked- Do this
- Open the file in Excel.
- Expected
- It opens, and its columns follow DOE's reporting template.
Blocked by RnD #31, RnD #53 milestone 7.
No result has been recorded for P7-REPORT-02 yet.
← P7-REPORT-01 P7-REPORT-03 → Open P7-REPORT-02 on its own page
P7-REPORT-03
Staff Blocked- Do this
- Find the test projects from Phases 4 to 6.
- Expected
- They appear with the right building codes and amounts.
Blocked by RnD #31, RnD #53 milestone 7.
No result has been recorded for P7-REPORT-03 yet.
← P7-REPORT-02 P7-REPORT-04 → Open P7-REPORT-03 on its own page
P7-REPORT-04
Staff Blocked- Do this
- Look for the test accounts' records.
- Expected
- They are left out, or labeled Test.
Blocked by RnD #31, RnD #53 milestone 7, customer #106.
No result has been recorded for P7-REPORT-04 yet.
Clean up
0 of 1 completed, 1 blocked.
- P7-CLEAN-01: Blocked P7-CLEAN-01 · Blocked by customer #106
P7-CLEAN-01
Staff Blocked- Do this
- Run the documented cleanup for this phase's test accounts, and record the before and after counts.
- Expected
- Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Blocked by customer #106.
No result has been recorded for P7-CLEAN-01 yet.