Wisconsin IRA Home Energy Rebates Signed in as Test user — test site only

← All applications

Multifamily HOMES Project

182 Housing Program Court, Madison 53703 · Whole multifamily building, 5 or more homes · 5 of 5 units occupied · Project code PRJ-3JL3-A732 · Submitted on the customer portal

Assigned to: Unassigned

Redemption review

In progress 0 of 28 checks answered

How many homes to sample

This property has 5 homes, so the chart requires 4 — both for the combustion safety tests and for the photo review.

IRA Multifamily Combustion Safety Sampling Rate
Homes in the property Homes to sample
5-9 homes4
10-29 homes7
30-49 homes10
50-99 homes15
100+ homes20

What the documents say

Account on the invoice
Not recorded
Matches the reservation and redemption applications
Not answered
Approved improvement cost
—
Allowable total from the invoice
$0.00
Combustion tests listed on the form
Not recorded
Actual install date
Not recorded
Final project cost
—
Final rebate
—
Final savings
—
Modeling method
Not recorded
Request received
Not recorded
More information requested
—
Information arrived
—
Request complete
Not recorded

The last four are what payment review checks when the request arrived incomplete. When it arrived complete, received and complete are the same day.

Invoice lines $0.00 allowable

No lines from the final invoice have been entered yet.

Add a line from the final invoice

Materials and labor can be combined into the line cost or broken out. Broken out, they have to add up to it.

Completion documents 0 of 8 answered

Every one of these must be here before the application can move to payment. Anything marked missing is named, so they can all be asked for in one go.

  • Building Owner Acknowledgement is submitted.Not answered
  • Combustion safety form is submitted.Not answered

    The Notification of Combustion and Mechanical Ventilation.

  • Signed offer letter and project summary are submitted.Not answered

    Signed and dated by the customer, with the installed dates entered.

  • Quality Install Tool is submitted.Not answered
  • Final invoice or invoices are submitted.Not answered

    A subcontractor's invoice is submitted as well where a subcontractor did part of the work.

  • Energy savings report is submitted.Not answered
  • 50121 HOMES audit report is submitted.Not answered
  • The HPXML or BuildingSync file is submitted.Not answered

    Which one depends on the property's size: HPXML under 5 homes, BuildingSync at 5 or more.

Final invoice requirements 0 of 14 answered

The procedure's fourteen requirements. "The below must be listed on the final invoice, or the application cannot move forward to payment."

  • Customer name is present.Not answered
  • Installation address is present.Not answered
  • Contractor name is present.Not answered
  • Contractor address is present.Not answered
  • Contractor phone number is present.Not answered
  • Cost is itemized by measure.Not answered
  • Total project cost is present.Not answered
  • Rebates applied are shown.Not answered
  • Total due after rebates is present.Not answered
  • The dates the work was performed are present.Not answered
  • The project completion date is present.Not answered
  • Model numbers are present where they are needed.Not answered

    Required for windows, appliances and HVAC mechanicals.

  • The payee on the invoice matches SPECTRUM and Atlas.Not answered
  • The customer has both signed AND dated the invoice.Not answered

    Both, not either: the procedure is explicit about it.

Combustion safety form 0 of 3 answered

  • Every test that was not completed has a reason detailed on the form.Not answered

    Follow up with the Energy Advisor, who will contact the contractor for confirmation.

  • Every issue the form shows has a resolution detailed on it.Not answered

    Follow up with the Energy Advisor, who will contact the contractor for confirmation.

  • The number of tests listed matches the required sample quantity.Not answered

    From the IRA Multifamily Combustion Safety Sampling Rate chart, on the number of homes in the property.

Quality install photo review 0 of 0 answered

Asked once for each sampled home. Identical time stamps, or photos that look the same across homes, are the procedure's cue to ask the Energy Advisor for more photos rather than to mark them off.

No home has been reviewed yet. Record the first photo check below and the home appears here.

Record a photo check

Reservation and redemption compared 0 of 3 answered

"Documents should match. Inconsistencies would indicate a potential change in scope and would require a full review."

  • The Asset Score report matches the one submitted at reservation.Not answered
  • The Audit Template report matches the one submitted at reservation.Not answered
  • The scope of work matches what was pre-approved.Not answered

Before this can be passed

  • The project is pre-approved (#33) Not met

    The pre-approval is at "Not started". A redemption is checked against what was pre-approved, so it cannot be reviewed before that has happened.

  • Aptim's payment review (#38) Met

    Passing this review hands the claim to Aptim's payment review queue by itself -- that queue reads this review's outcome, so the claim appears there as soon as this passes, with the figures recorded here. Nobody has to forward anything.

The decision

This review cannot be passed yet:

  • 28 of 28 checks are still unanswered.
  • The account on the invoice has not been confirmed as matching the reservation and redemption applications.
  • The install date, final cost, final rebate, savings percentage and modeling method are not all recorded.
  • The pre-approval is at "Not started". A redemption is checked against what was pre-approved, so it cannot be reviewed before that has happened.

This is what the contractor is asked for, so it has to name the materials to remedy. Failing starts the 44-day incomplete clock (#35).

Checked against the procedure of 2026-09-17 — HOMES - MF - Intake and Qualifying Procedures (Redemption Qualification, Final Invoice, Invoice Requirements, Combustion Safety Form, Quality Install Photo Review) and HOMES - MF - Custom App Entry Procedure (MF HOMES Payment Request Entry), from IRA_RnD focus_reference_docs at 373b4ca. The procedure document.

Email

Incomplete application Application closing General notification

From
irahomes@focusonenergy.com
Delivered to
matt@openwatt.io (this is test: nothing reaches an applicant, a contractor or a colleague)

Deny

They read it under the status on their application page. Leave it unticked for a note only staff should see.

Send back for more information

They read it under the status on their application page. Leave it unticked for a note only staff should see.

Assign

Control Center has no application called IRA PI/PA Portal (409), so it cannot say who has access to this portal. This list shows the people who have used this portal.

Timeline

Nothing has happened to this application yet.