Multifamily HOMES Project
198 HPXML Test Court, Madison 53703 · Whole multifamily building, 5 or more homes · 6 of 6 units occupied · Project code PRJ-RX6V-USTG · Submitted on the customer portal
Assigned to: Unassigned
Payment review
In progress Multifamily HOMES project 0 of 17 checks answered
Other claims on this address
No other multifamily claim is recorded on this address. The portal looked; this is not a check nobody ran.
What the documents say
- Income level
- Market rate
This property has no income qualification, so the procedure processes it at market rate. See the working.
- Savings
- —
- Savings in the DOE (HPXML) file
- —
- Measure
- Not recorded
- Primary heating fuel
- Not recorded
- Therm savings entered
- Not answered
- Enhanced incentives
- Not answered
- Disadvantaged community
- Not answered
- Assessment incentive paid
- Not answered
- Who is paid
- Not recorded
- Assessment report date
- Not recorded
- Project completion date
- Not recorded
- Calibration
- Not recorded
Savings and the measure 0 of 5 answered
The savings decide the rebate, so all four of these have to agree with each other before anything is paid.
-
The savings are 19.5% or more.Not answered
DOE rounds up to 20%, so 19.5% is the floor the procedure accepts.
-
The savings are in line with the measure chosen.Not answered
The measure list runs 20-34% and 35%+, at each income level.
-
The savings match the DOE (HPXML) file within a point or two.Not answered
-
Therm savings are entered only where the fuel is natural gas.Not answered
Any other fuel may leave the therm fields blank.
-
The savings recorded here match the savings entered in SPECTRUM.Not answered
Income and enhanced incentives 0 of 4 answered
The income level is read from this property's own qualification and the 50%-of-occupied-units rule, never typed here.
-
Low and moderate income claims show enhanced incentives as yes.Not answered
-
A disadvantaged-community property has its bonus measure present.Not answered
-
Where an assessment incentive was paid, its cost is not in the project cost.Not answered
-
Moderate and market-rate claims do not show an assessment incentive as paid.Not answered
If one does, it goes back for correction. A low-income claim showing no is read against the rest of the account instead.
Who is paid, and what the invoice shows 0 of 3 answered
-
The payee matches SPECTRUM and Atlas.Not answered
-
The invoice shows what paying that party requires.Not answered
Paying the contractor means an instant discount on the invoice. Paying the customer means the rebates are listed and not deducted.
-
Where the customer is paid, they are moderate income or above.Not answered
The assessment report 0 of 4 answered
-
The assessment date is within 3 years of the project completion date.Not answered
-
The report shows its calibration passed.Not answered
A SNUGG report says so on its tech specs page. An Optimizer report may not print it, and the utility data on the report is what is read instead.
-
Every measure on the report has a line on the invoice.Not answered
-
Only approved measures contribute to the savings.Not answered
Equipment against ENERGY STAR
No model number is recorded on this claim's measures, so there is nothing to look up against ENERGY STAR.
Contractor spot-check
The day's sample did not pick this claim, so no license check is asked for. About one claim in four is picked, and the portal draws the sample rather than the reviewer.
Duplicate check 0 of 1 answered
The procedure's first step, and the reason it exists: the same property must not be paid twice.
-
No other claim on this property address is a duplicate of this one.Not answered
Every other claim on the address is listed below, with where it has got to. A likely duplicate goes back to the Implementer.
Errors
No error has been raised on this claim.
Before this can be approved
-
The redemption review has passed (#37)
Not met
The redemption review is “In progress”. A claim reaches payment review by passing it, so this one is not ready to be paid.
-
The HOMES measure check (#32)
Cannot be checked
The portal cannot check the savings against the measure chosen yet -- that is #32, which is still being written. Until it is, whoever approves this is confirming the measure by hand, against the measure list.
The decision
This claim cannot be approved yet:
- 17 of 17 checks are still unanswered.
- The figures this claim is checked against are not all recorded.
- The redemption review is “In progress”. A claim reaches payment review by passing it, so this one is not ready to be paid.
Checked against the procedure of 2026-09-17 — HOMES Payment Reviews (Duplicate check, Application review, Handling Application Errors), HOMES MF Assessment Incentive Application Processing Procedure, and IRA Assessment Incentive Approvals, from IRA_RnD focus_reference_docs at 373b4ca. The procedure document.
Deny
Send back for more information
Assign
Timeline
Nothing has happened to this application yet.